Zhang Feiteng
School of Mines, China University of Mining and Technology, Xuzhou, Jiangsu Province, China, 221116
E-mail: zhangft@cumt.edu.cn
Education Background
Doctor of Engineering, School of Mines (CUMT), 2024
Bachelor of Engineering, School of Mines (CUMT), 2018
Experience
Postdoctoral fellow, School of Environment and Spatial Informatics (CUMT), China, 2024.06-Present, full time
Areas of Research Interests/ Research Projects
Ground control
Hydraulic fracturing
Papers Published in English Journals:
1. Zhang F, Wang X, Bai J, et al. Fixed-Length Roof Cutting with Vertical Hydraulic Fracture Based on the Stress Shadow Effect: A Case Study[J]. International Journal of Mining Science and Technology, 2022,32(2):295-308.
2. Zhang F, Wang X, Bai J, et al. Study on Hydraulic Fracture Propagation in Hard Roof Under Abutment Pressure[J]. Rock Mechanics and Rock Engineering, 2022,55(10):6321-6338.
3. Zhang F, Wang X, Wang Q, et al. Numerical Modeling of Engineering-Scale Jointed Coal Mass and Confining Pressure Effect[J]. Applied Sciences, 2024,14(24):11844.
4. Zhang F, Wang X, Bai J, et al. Post-Peak Mechanical Characteristics of the High-Water Material for Backfilling the Gob-Side Entry Retaining: From Experiment to Field Application[J]. Arabian Journal of Geosciences, 2020,13(11):386.
5. Chen D, Wang X, Zhang F, et al. Study on the Mechanism of Progressive Instability of Special-Shaped Coal Pillar and the Stability Control of Roadway Under the Influence of Mining[J]. Rock Mechanics and Rock Engineering, 2024,57(8):6461-6483.
Selected Invention Patents:
1. Zhang F, Wang X, Bai J, et al. Integrated Equipment for Multi-stage Drilling Sealing, Fracturing, Grouting and Water Injection and Its Application Method[P]. ZL201910699081.1, 2024-05-10, Authorized.
2. Zhang F, Wang X, Bai J, et al. Segmented Directional Hydraulic Fracturing Method for Thick Hard Roof in Gob-side Entry Retaining[P]. ZL202110361261.6, 2022-03-15, Authorized.
3. Zhang F, Wang X, Bai J, et al. Hydraulic Fracturing Roof-cutting Method for Gob-side Entry Retaining in Thick Coal Seam[P]. ZL202110333342.5, 2021-12-31, Authorized.
4. Wang X, Zhang F, Bai J, et al. Underground Construction Method for Hydraulic Fracturing of High-position Roof in Coal Seam Group[P]. ZL202010573165.3, 2021-02-09, Authorized.
5. Wang X, Zhang F, Yi W, et al. Hydraulic Fracturing Trajectory Determination Method Based on Borehole Imaging Device[P]. ZL202010150233.5, 2021-02-26, Authorized.